This post was last edited by Desert Fish on 2015-11-6 07:52. Those who come to do exercises every day are the hardworking forum members who love learning! ! Today marks the start of the project management series – welcome to join! http://bbs.hcbbs.com/static/image/hrline/line7.pnghttp://bbs.hcbbs.com/static/image/hrline/line7.pnghttp://bbs.hcbbs.com/static/image/hrline/line7.pnghttp://bbs.hcbbs.com/static/image/hrline/line7.pnghttp://bbs.hcbbs.com/static/image/hrline/line7.pnghttp://bbs.hcbbs.com/static/image/hrline/line7.png http://bbs.hcbbs.com/static/image/hrline/line7.pnghttp://bbs.hcbbs.com/static/image/hrline/line7.pnghttp://bbs.hcbbs.com/static/image/hrline/line7.pnghttp://bbs.hcbbs.com/static/image/hrline/line7.pnghttp://bbs.hcbbs.com/static/image/hrline/line7.pnghttp://bbs.hcbbs.com/static/image/hrline/line7.png Some questions from this year’s first-level constructor exam have been collected, along with their answers. I’m sharing them here to encourage more people to participate. Instead of posting all of them at once, a few multiple-choice questions or one case study will be presented each time, with the answers hidden. The answer will be visible after responding. Everyone is welcome to participate; the moderator will give rewards to those who give correct answers. ****************************************** 13. Which of the following statements about the nature of work carried out by engineering supervision units is correct?( ) A. When entrusted by the owner, the engineering supervision unit must ensure the achievement of the project objectives. B. The engineering supervision unit shall not be organizationally dependent on the entity whose work is under supervision. C. All personnel engaged in supervision work by the engineering supervision unit must be registered supervision engineers. D. The engineering supervision unit acts as an independent third party to resolve conflicts between the owner and the contractor. Answer: B 14. Regarding the contents of FIDIC’s “Conditions of Contract for Plant and Construction”, which statement is correct? A. The owner appoints an engineer to manage the contract. B. The contractor is only responsible for providing the equipment and carrying out the construction work. C. The contract pricing uses a unit price system, with certain sub-projects having fixed prices. D. The contract pricing uses a lump-sum system, and the contract price cannot be adjusted. Answer: A
The engineering supervision unit should not be organizationally dependent on the entity whose work is being supervised; otherwise, there will be conflicts of interest that affect the quality of the work
The engineering supervision unit should not be organizationally dependent on the entity whose work is being supervised; otherwise, there will be conflicts of interest that affect the quality of the work
Regarding the nature of the work carried out by engineering supervision units, the correct statement is (c). C. All personnel engaged in supervision work by the engineering supervision unit must be registered supervision engineers
Regarding the contents of FIDIC’s \"Permanent Equipment and Design – Construction Contract Conditions\", which statement is correct? (a) A The employer appoints an engineer to manage the contract
13. B. The engineering supervision unit cannot be organizationally affiliated with the entity whose work is under supervision. 14. A The owner appoints an engineer to manage the contract
A. The project supervision unit, upon being entrusted by the owner, must ensure the achievement of the project objectives; A The owner appoints an engineer to manage the contract
13. Regarding the nature of the work carried out by engineering supervision units, the correct statement is (B). A. When entrusted by the owner, the engineering supervision unit must ensure the achievement of the project objectives. B. The engineering supervision unit shall not be organically affiliated with the entity whose work is under supervision. C. All personnel engaged in supervision work by the engineering supervision unit must be registered supervision engineers. D. The engineering supervision unit acts as an independent third party to resolve conflicts between the owner and the contractor. 14. Regarding the contents of FIDIC’s “Conditions of Contract for Plant and Design-Build”, which statement is correct? (A) A – The owner appoints an engineer to manage the contract. B – The contractor is only responsible for providing the equipment and carrying out the construction work. C – The contract pricing is based on a unit price system, with certain sub-projects having fixed prices. D – The contract pricing is based on a lump-sum price system, and the contract price cannot be adjusted