HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Catalyst gauge reading

2015-11-06View Original

Thread Content

How is the amount of catalyst to be added calculated based on the gauge reading?
Reply #22015-11-06
Measure the height with a ruler; the height of new agent tanks is generally not checked
Reply #32015-11-06
We used to measure the length every day, calculate the difference over two days, and also determine the weight of each meter of catalyst, and that’s how we figured it out. A radar detector has now been installed, so there’s no need for length measurements anymore
Reply #42015-11-09
The cross-sectional area of the catalyst tank is determined from its internal diameter; the difference between the measurements taken twice gives the height, from which the volume of catalyst added can be calculated. Multiplying this volume by the density of the catalyst yields the amount of catalyst that was added. However, there are very few cases where this method is still necessary nowadays.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.