【Daily Question】November 7, 2015: Boiler True/False Questions (3 wealth points for replying; +3 to 8 additional wealth points for correct answers)

2015-11-07View Original

Thread Content

The Machinery Section has introduced the 【Daily Question】 feature, which not only fosters an active atmosphere for technical exchanges and guides the direction of such exchanges, but also provides users with financial rewards to help them experience various cool features. True or False: Inspection can be carried out after the drum, furnace, and flue doors are opened. () Please note: We will close this thread after 24 hours, and at that time we will announce the best reply (the best assistance), as well as the answer and explanation. Charisma Reward: Those who post a topic in this section within two days to provide a detailed explanation or discussion on the knowledge points related to this question are asked to reply/comments in this post to inform us, and we will then award them charisma points. It is not allowed to simply copy and paste; original content is preferred, with at least some organization by the user along with personal insights. After registration, we will rank participants based on the content of their posts: the last-place contestant will receive +1 charm, the second-to-last +2 charm, and so on, with the highest score earning +5 charm.
Reply #22015-11-07
Error-------------------------Cooling, ventilation, and air exchange are highly necessary
Reply #32015-11-07
Inspection can be carried out after the boiler drum, furnace, and flue doors are opened. (X)
Reply #42015-11-07
Inspection can be carried out after the boiler drum, furnace, and flue doors are opened. (Mistake)
Reply #52015-11-07
Inspection can be carried out after the boiler drum, furnace, and flue doors are opened. (Mistake)
Reply #62015-11-07
Inspection can be carried out after the boiler drum, furnace, and flue doors are opened. (Mistake)
Reply #72015-11-07
True or False: Inspection can be carried out once the boiler drum, furnace, and flue doors are opened. (×)
Reply #82015-11-07
Inspection can be carried out after the boiler drum, furnace, and flue doors are opened. (Mistake)
Reply #92015-11-07
Inspection can be carried out after the boiler drum, furnace, and flue doors are opened. (Mistake)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.