HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Method for replacing the riser tube installed on the focal side

2015-11-17View Original

Thread Content

The rising pipes of our coke oven are installed on the coke side; it is a 5.5-meter rammed coke oven. Some of the bases have now developed problems and need to be replaced, but the rising pipes are located at a considerable distance from all directions. Does anyone have any good suggestions for replacing them?
Reply #22015-11-17
What causes severe damage to the rising tube base? Could you explain it in detail? Photos would be great! !
Reply #32015-11-18
It’s just that over time, cracks appeared, causing raw gas to leak and smoke to emanate; there’s no special reason for this.
Reply #42015-11-18
This method is good, but the smoke exhaust vehicle needs to be modified. But things are urgent right now; are there any temporary measures, methods with lower costs?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.