If there are control valves on the pipeline from the side line of the fractionation tower to the stripping tower, the control valve assembly should be installed near the stripping tower to ensure proper regulation...

2015-11-24View Original

Thread Content

As the title suggests, the material drawn off via the side line is usually in gas phase; why is it necessary to ensure that there is a liquid column ahead of the valve?; What kind of technical requirements are generally there? Are there any examples that can illustrate this? Thank you...
Reply #22015-11-25
The liquid column ensures that a gas-liquid two-phase condition does not occur ahead of the valve
Reply #32015-11-25
The output from the side line isn’t the gas phase, right? ?
Reply #42015-11-25
Well, it can be in the vapor phase or the liquid phase.
Reply #52015-11-25
Wouldn’t it be better if the feed to the stripper were in vapor form? Couldn’t the control valve for the margin also be operated with vapor?
Reply #62015-11-25
Why can’t we add a gas-liquid separation tank? Ensure that what is drawn out is the gas phase.
Reply #72015-11-26
The inlet of the control valve must not be in a gas-liquid two-phase state; otherwise, cavitation is likely to occur in the valve, making regulation difficult
Reply #82015-11-26
If the vapor phase is drawn off through the side line, that ensures it’s a vapor phase; isn’t that also fine? Wouldn’t it be more beneficial for the stripping tower later on?
Reply #92015-11-26
That separated liquid still needs to go to the stripping tower; adding energy before the control valve can also ensure it remains in vapor form. By passing a small amount of superheated steam, the amount of vapor that liquefies due to pressure drop is very small...
Reply #102015-11-26
In this case, doesn’t the liquid phase also turn into a gas phase? This is not the same concept as the pumping phase.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.