HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Bid transmitter

2015-12-04View Original

Thread Content

What should be taken into account when bidding for transmitters for the first time? What questions and requirements should be raised? I would appreciate guidance from experts. Thank you, it’s urgent – what are the key points to keep in mind?
Reply #22015-12-04
Standardize the grades and types of valve assemblies; good valve assemblies are not cheap. @jiaguoyun
Reply #32015-12-04
According to the design specifications, it is usually the design institute that provides the data, so as to assess the quality
Reply #42015-12-05
When bidding on transmitters, it is recommended to compare prices based on the same quality and technical platform; otherwise, it will cause a lot of headaches. There should be tender documents for a bidding process, right? It’s recommended to prepare them thoroughly so as to avoid having to answer their repeated questions
Reply #52015-12-05
The buyer is the bid, and the seller is the tender documents; you need to put down in writing all the things you want to convey, such as quantities, requirements, and so on

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.