HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

inside

2015-12-16View Original

Thread Content

This post was last edited by Dreamwalker on 2019-6-8 20:19 due to
Reply #22015-12-16
Please discuss this, thank you!
Reply #32015-12-16
Why a short stop? Air separation needs to address the defects; it will take about 2 hours to replace the gasification burner. The specifics can be discussed in person; it seems that even after hearing about it, it’s quite difficult, especially regarding primary refrigerant hydrocarbons
Reply #42015-12-17
Yes. Backwashing of the heat exchanger at the pressurization end of the expander, and backwashing of the cooler in the expander’s light oil station.
Reply #52015-12-17
This type of short shutdown requires at least four to five hours; the liquid oxygen pump does not need to be stopped. By monitoring the plate temperature difference, it’s sufficient to shut down the expander, and the throttle valves should be adjusted to a lower setting

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.