HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】【Quality Version 20151222】

2015-12-22View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. (Question) In quality management, what do the “P”, “D”, “C”, and “A” in the PDCA cycle stand for? PDCA stands for the first letters of the English words Plan (planning), Do (execution), Check (inspection), and Action (taking action). The PDCA cycle is a scientific process for quality management that follows this sequence, with the cycle repeating continuously.
Reply #22015-12-22
PDCA (P—Plan, planning; D—Do, execution; C—Check, inspection; A—Act, action) The PDCA cycle is also known as the Deming cycle. It was first proposed by the American quality management expert Dr. Deming, and it represents the scientific process that should be followed in total quality management.
Reply #32015-12-22
What do the “P”, “D”, “C”, and “A” in the PDCA cycle applied to quality management represent? P: Planning (design) D: Execution (implementation) C ; Check D ; Improvement
Reply #42015-12-22
 PDCA stands for the first letters of the English words Plan (planning), Do (execution), Check (inspection), and Action (taking action). The PDCA cycle is a scientific process for quality management that follows this sequence, with the cycle repeating continuously.
Reply #52015-12-22
P: PLAN – Planning; D: DO – Execution; C: CHECK – Inspection; A: ACTION – Correction measures
Reply #62015-12-22
P”, “D”, “C”, and “A” stand for the first letters of the English words Plan (plan), Do (execute), Check (inspect), and Action (take action). The PDCA cycle is a scientific process for quality management that follows this sequence, with the cycle repeating continuously.
Reply #72015-12-22
What do the “P”, “D”, “C”, and “A” in the PDCA cycle applied to quality management represent? P plan D execute C check A process
Reply #82015-12-22
PDCA (P—plan, planning; D—do, execution; C—check, inspection; A—act, action taken)
Reply #92015-12-22
P(PLAN) – Planning: Establish the necessary objectives and processes to achieve desired results, based on customer requirements and organizational policies. D(DO) – Execution: Carrying out the planned processes. C(CHECK) – Inspection: Monitoring and measuring processes and products in accordance with policies, objectives, and product requirements, and reporting the results. A(ACTION) – Action: Taking measures to continuously improve process performance.
Reply #102015-12-22
PDCA: P—plan, planning; D--do, execution; C--check, inspection; A- act, taking action

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.