HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

20151223 One question per day

2015-12-23View Original

Thread Content

20151223 Daily Question: Rewards are as follows: 1-3 points for participation, plus 3-5 points if the answer is correct along with an analysis. The main causes of power system power-frequency overvoltage are: ( ) Multiple choice A. Ground fault ; B. Load shedding ; C. Capacitive effect of an unloaded line ; D. Lightning effect. Answers ABC
Reply #22015-12-23
A, B, C, ———————– ———————– ———————– ———————–
Reply #32015-12-23
The main causes of power system power-frequency overvoltage are: (ABC) A. Ground fault; B. Load shedding ; C. Capacitive effect of an unloaded line ; D. Lightning effect.
Reply #42015-12-23
The main causes of power system power-frequency overvoltage are: (B C D) A. Ground fault; B. Load shedding ; C. Capacitive effect of an unloaded line ; D. Lightning effect.
Reply #52015-12-23
The main causes of power system power-frequency overvoltage are: (ABC)
Reply #62015-12-23
The main causes of power system power-frequency overvoltage are: (AB) Multiple choice A. Ground fault; B. Load shedding ; C. Capacitive effect of an unloaded line ; D. Lightning effect.
Reply #72015-12-23
The main causes of power system power-frequency overvoltage are: (A B C) A. Ground fault; B. Load shedding ; C. Capacitive effect of an unloaded line ; D. Lightning effect.
Reply #82015-12-23
The main causes of power system power-frequency overvoltage are: ( ) Multiple choice C. The capacitive effect of unloaded lines; D. Lightning effect.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.