HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is it necessary to have a separate pressure-taking pipeline for the lockbox design?

2016-01-05View Original

Thread Content

For the lock-hopper system, a separate pressure tapping pipeline is designed, with a pressure gauge installed on it. Is it necessary to design this separate pipeline? The aim is to eliminate such a pressure tapping pipeline and reduce the number of openings in the equipment that are subject to fatigue.
Reply #22016-01-05
Most likely, there are no separate pressure tapping pipes; they are now installed on the flushing water pipeline.
Reply #32016-01-06
All three sets of equipment I’ve worked with were set up in this way: two sets were from Donghua, and one set was from Tianchen. I think it’s sufficient to install them on the high-pressure bypass pipes at the inlet for the lockbox flushing water.
Reply #42016-01-06
Shenhua Baotou, designed by Tianchen. There is also no dedicated pressure tapping tube. However, the Shaanxi Changqing designed by Donghua does exist; I think there’s absolutely no need to do this.
Reply #52016-01-06
Right, theirs are the same as ours

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.