HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Joint Study*】【Civil Engineering Version 20160101】

2016-01-06View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. What must be disconnected from the base is ( ). A. Expansion joint B. Temperature joint C. Settlement joint D. Construction joint Answer: C. Settlement joint
Reply #22016-01-06
What must be disconnected at the foundation is (C. settlement joint).
Reply #32016-01-06
What must be disconnected is (C). A. Expansion joint B. Temperature joint C. Settlement joint D. Construction joint
Reply #42016-01-06
What must be disconnected is (C). A. Expansion joint B. Temperature joint C. Settlement joint D. Construction joint
Reply #52016-01-06
What must be disconnected is (C). A. Expansion joint B. Temperature joint C. Settlement joint D. Construction joint
Reply #62016-01-06
What must be disconnected is (C). A. Expansion joint B. Temperature joint C. Settlement joint D. Construction joint

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.