This post was last edited by Sulfur-Zinc-Aluminum on 2016-1-13 08:10. 1. The pollution control facilities in a construction project should be integrated with the main structure ( ). Facilities for pollution control shall comply with the requirements of the approved environmental impact assessment documents, and shall not be removed or left unused without authorization. A. Design simultaneously, and put it into production and use at the same time. B. Design simultaneously, and start construction at the same time. C. Design simultaneously, start construction simultaneously, and put it into production and use at the same time. Answer: C
Reply #22016-01-11
C. Design simultaneously, construct simultaneously, and put into production use simultaneously~~~~~~~~~~~~~
Reply #32016-01-11
1. The pollution control facilities in a construction project shall be integrated with the main project (A). Facilities for pollution control shall comply with the requirements of the approved environmental impact assessment documents, and shall not be removed or left unused without authorization. A. Design simultaneously, and put it into production and use at the same time B. Design simultaneously, and start construction at the same time C. Design simultaneously, start construction simultaneously, and put it into production and use at the same time
Reply #42016-01-11
C. Design simultaneously, construct simultaneously, and put into production use simultaneously
Reply #52016-01-11
C. Design simultaneously, construct simultaneously, and put into production use simultaneously
Reply #62016-01-11
C. Design simultaneously, construct simultaneously, and put into production use simultaneously
Reply #72016-01-11
1. The pollution control facilities in a construction project shall be integrated with the main structure (C). Facilities for pollution control shall comply with the requirements of the approved environmental impact assessment documents, and shall not be removed or left unused without authorization. A. Design simultaneously, and put it into production and use at the same time B. Design simultaneously, and start construction at the same time C. Design simultaneously, start construction simultaneously, and put it into production and use at the same time

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.