Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. According to the \"Unified Standard for Quality Inspection of Building Construction\" (GB50300—2013), regarding the requirement that the quality inspection of a batch be deemed satisfactory, which statement is correct?     A. There should be complete documentation for construction procedures and quality inspection records.    B. Inspection can be organized by the supervisor.    C. It is not necessary for all critical items to pass inspection.    D. Inspection of general items carries a veto power
Reply #22016-01-22
According to the \"Unified Standard for Quality Inspection of Building Construction\" (GB50300—2013), regarding the requirement that the quality inspection of a batch be deemed satisfactory, the correct option is (a).     A. There should be complete documentation for construction procedures and quality inspection records.    B. Inspection can be organized by the supervisor.    C. It is not necessary for all critical items to pass inspection.    D. Inspection of general items carries a veto power
Reply #32016-01-23
According to the \"Unified Standard for Quality Inspection of Building Construction\" (GB50300—2013), regarding the requirement that the quality inspection of a batch be deemed satisfactory, the correct option is (A).     A. There should be complete documentation for construction procedures and quality inspection records.    B. Inspection can be organized by the supervisor.    C. It is not necessary for all critical items to pass inspection.    D. Inspection of general items carries a veto power
Reply #42016-01-23
According to the \"Unified Standard for Quality Inspection of Building Construction\" (GB50300—2013), regarding the requirement that the quality inspection of a batch be deemed satisfactory, the correct option is (A).     A. There should be complete documentation for construction procedures and quality inspection records.    B. Inspection can be organized by the supervisor.    C. It is not necessary for all critical items to pass inspection.    D. Inspection of general items carries a veto power
Reply #52016-01-23
According to the \"Unified Standard for Quality Inspection of Building Construction\" (GB50300—2013), regarding the requirement that the quality inspection of a batch be deemed satisfactory, the correct option is (A).     A. There should be complete documentation for construction procedures and quality inspection records.    B. Inspection can be organized by the supervisor.    C. It is not necessary for all critical items to pass inspection.    D. Inspection of general items carries a veto power
Reply #62016-01-23
A. It should have complete construction operation guidelines and quality inspection records
Reply #72016-01-23
A. It should have complete construction operation guidelines and quality inspection records
Reply #82016-01-23
C. Not all control items need to pass inspection

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.