Methanol Spring Festival topics What should be done if a methanol circulation pump stops suddenly? 2016.02.01---02.07

2016-01-31View Original

Thread Content

The Spring Festival is approaching, and I would like to wish everyone: May the Spring Festival help us bid farewell to the old year and welcome the new one with joy! Happy family! Career progress! Everything goes as planned! Methanol Weekly Topic: What to do if the methanol circulation pump stops suddenly? 2016.02.01---02.14
Reply #22016-02-01
Can’t loop? I guess it’s to turn this off
Reply #32016-02-01
Cut off the raw gas inlet, maintain the insulation and pressure in the synthesis tower, quickly start the backup unit; if no backup unit is available, immediately shut off the inlet and outlet of the circulation pump, depressurize the circulation pump. After that, restart the circulation pump, and once circulation is normal, connect the gas to the synthesis process
Reply #42016-02-01
This post was last edited by wamj6566 on 2016-2-1 at 13:12. OP, the questions you posed are really great! It was after 10 o’clock when I replied to the post; just after that, it was past 11 o’clock. Then I reported that the circulation machine had stopped operating due to an issue with the gas supply. I rushed to the scene immediately. The lubrication pump of the circulation machine lost power due to an electrical problem, which caused the machine to shut down in a chain reaction. The steps taken to resolve the issue were as follows: quickly close the inlet valve for fresh gas, maintain the temperature and pressure in the synthesis tower, close the inlet and outlet valves of the circulation machine to release pressure. After the electrical issue was fixed and power was restored, the inlet valve of the circulation machine was opened for gas replacement, followed by restarting the machine. The inlet valve for fresh gas was then opened gradually to allow gas to flow in. The entire process took around 30 minutes, after which production resumed normal. I not only answered your questions but also handled the situation on-site. What a coincidence, haha
Reply #52016-02-01
Close the inlet and outlet valves to release the pressure; it can be released completely, or to a level lower than that of the nitrogen used for the dry gas seal before restarting the system.
Reply #62016-02-05
After the circulation machine trips, the main consideration is the protection of the catalyst. Quickly close the raw gas inlet valve; it is also more convenient to set it up for interlocked closure. As for the synthesis pressure, it is recommended to maintain the pressure first, and then slowly release it depending on the temperature of the bed layer, to strictly prevent the catalyst from overheating.
Reply #72016-02-11
Turn off the feed gas; depressurize and insulate the reactor for synthesis.
Reply #82016-02-11
Turn off the feed gas; depressurize and insulate the reactor for synthesis.
Reply #92016-02-14
Release pressure, maintain heat insulation, start the circulation machine and feed material to apply load.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.