Issues with the horizontal assembly of the inner and outer shells of a 150 cubic meter LNG storage tank

2016-02-18View Original

Thread Content

The 150-cubic-meter LNG storage tank manufactured by our company has an outer shell diameter of 3800 mm, an inner liner diameter of 3300 mm, and a height of 21,000 mm. Due to its large diameter and long length, it is not possible to assemble it in a vertical configuration. I would like to ask experienced technicians how such an assembly can be carried out in a horizontal position; please share your valuable insights.
Reply #22016-02-18
I’ve really never seen an LNG tank this tall; waiting for an answer.
Reply #32016-02-20
Hasn’t anyone built LNG storage tanks before? I’ve never done the 150 one; I’ve done the 100 one at least once. Let’s share our experiences each. It feels so quiet here:Q
Reply #42016-02-20
There are many people and matters to deal with at the moment; it’s necessary to wait until things stabilize.
Reply #52016-02-25
For laying the sleeve on vertical storage tanks, just like with ordinary horizontal tanks, a special tool is used; two cranes working together are sufficient
Reply #62016-02-25
It’s very simple: arrange slides in the outer shell, build a small cart, place the inner container on that cart, push it into the outer shell, pull out the cart, and weld together the seams – and that’s it.
Reply #72016-02-25
If you think my method is good, give it a best rating.
Reply #82016-02-29
The outer shell has reinforcement rings; is it necessary to cut notches in those rings? If assembly is to be carried out using a sliding track, how should such a track be constructed? Should it be welded to the inner tank, or what approach should be taken? It would be helpful to have a simple diagram so that I can understand better. Thank you.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.