This post was last edited by hesonchang214 on 2016-3-3 09:35. Reward for participation: 2 wealth points. Reward for correct answer: 9 wealth. A certain construction project consists of two individual projects, A and B, and their costs are shown in the table below. If the total cost for survey and design work on the project is 1 million yuan, then the amount that Project B should bear for survey and design work is ( ) million yuan.   Single project: Construction cost (10,000 yuan), Installation cost (10,000 yuan), Value of equipment to be installed (10,000 yuan)
A: 3500, 500, 2000
B: 1500, 300, 1200
A. 30.0 B. 31.0 C. 33.3 D. 37.5
Correct answer: A. 30.0
Reply #22016-02-20
A certain construction project consists of two individual projects, A and B, and their costs are shown in the table below. If the total cost for survey and design work on the project is 1 million yuan, then the amount that Project B should bear for survey and design work is (A) million yuan.   Individual project: Construction cost (10,000 yuan), Installation cost (10,000 yuan), Value of equipment to be installed (10,000 yuan)   A: 3500, 500, 2000   B: 1500, 300, 1200    A. 30.0 B. 31.0    C. 33.3 D. 37.5
Reply #32016-02-20
A certain construction project consists of two individual projects, A and B, and their costs are shown in the table below. If the total cost for survey and design work on the project is 1 million yuan, then the amount that Project B should bear for survey and design work is (A) million yuan.   Individual project: Construction cost (10,000 yuan), Installation cost (10,000 yuan), Value of equipment to be installed (10,000 yuan)   A: 3500, 500, 2000   B: 1500, 300, 1200  A. 30.0 B. 31.0   C. 33.3 D. 37.5
Reply #42016-02-20
A certain construction project consists of two individual projects, A and B, and their costs are shown in the table below. If the total cost for survey and design work on the project is 1 million yuan, then the amount that Project B should bear for survey and design work is (A) million yuan.   Individual project: Construction cost (10,000 yuan), Installation cost (10,000 yuan), Value of equipment to be installed (10,000 yuan)   A: 3500, 500, 2000   B: 1500, 300, 1200   A. 30.0 B. 31.0   C. 33.3 D. 37.5

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.