HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How are the public utility ducts within your factory area divided?

2016-02-21View Original

Thread Content

Is each workshop responsible for a certain section, or is it divided according to the process? Is it related to the manufacturing process? Which workshop is responsible for the pipelines used, and which workshop is in charge of matters related to hygiene? Responsibilities are divided accordingly. . . . This peripheral conduit is really a pain in the neck. . . I wonder if there is a better and fairer way to divide it. . .
Reply #22016-02-21
Who is responsible for dividing the company’s areas? Who is in charge of managing and maintaining the public utility tunnels?
Reply #32016-02-21
How are things like heat tracing classified?
Reply #42016-02-21
This is our territorial management approach. In other words, I’m in charge of my own territory. :lol
Reply #52016-02-21
Whoever uses it is responsible for it. Especially for material pipelines, it is not possible to use one pipeline from a workshop and assign it to many other workshops. Additionally, the utility pipelines are classified as utility pipes. If the scope is broad, it can be assigned to the management of the workshop where it is located. Scheduling coordinates this process.
Reply #62016-02-21
Regarding the division of cleaning areas, within our company’s factory premises, the Production Department is responsible for that task; it then arranges for each processing stage to be cleaned itself. It’s all taken care of by the Production Department!
Reply #72016-02-21
Territorial management: whoever is in charge of a particular area is responsible for it
Reply #82016-02-21
We are a newly established project that has not yet started operations. However, according to the director and other supervisors, the responsibility for external pipe corridors is determined by the unit from which the pipelines originate; that unit is responsible for managing those pipelines all the way to the boundary of the workshop where they are received. In other words, the party that supplies the medium is responsible for ensuring it reaches the user’s location.
Reply #92016-02-22
Our company’s pipeline management follows the \"delivery-based\" principle, with the pipeline delivery unit being responsible for delivering it to the customer’s site; The pipelines within the user interface are the responsibility of the user ; The utility ductwork is managed by a separate \"steam plant\" ; The main control room is responsible for assigning tasks, while each branch plant follows the instructions from the main control room to resolve any disputed issues.
Reply #102016-02-24
The external utility pipelines are handled by a dedicated workshop. The material pipeline operates on a delivery system: the person who delivers the material is responsible for bringing it to the other party’s boundary area.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.