HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Flue pipe connection?

2016-02-24View Original

Thread Content

As the title suggests, I would like to install a DN250 exhaust pipeline in the flue gas duct between the boiler outlet and the desulfurization tower. The pressure required is around 20 KPa, and the flow rate is approximately 300 Nm3. I would like to know if there are any relevant design specifications or standards that can be used as a reference The main consideration is ensuring even distribution of exhaust gases within the flue; there is a elbow approximately 3 meters behind the flue connection, and the flue dimensions are 4*4 meters.
Reply #22016-02-24
What is the purpose of connecting this DN250 waste gas pipeline?
Reply #32016-02-28
Waste gas containing sulfur dioxide is introduced and treated using flue gas desulfurization.
Reply #42016-02-28
Welcome more participation from Little Piggy in the conversations
Reply #52016-02-28
The flue is large enough, so it should not cause any issues; the industrial pipeline design standards can be referred to
Reply #62016-02-28
Check valves and control valves should be considered for the access branch pipe

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.