The vertical thermosyphon reboiler is not installed vertically

2016-02-25View Original

Thread Content

The outlet nozzle of the vertical reboiler in the tower is connected directly to the tower’s nozzles. After installation, it was found that the vertical thermosyphon reboiler (10 meters high) was not vertical, with an upward or downward deviation of around 20 mm. Could this have an impact on operations? Are there any documents indicating the effects of such a non-vertical installation on operation? Books and standards, etc., as well as factory production experience are also acceptable.
Reply #22016-02-25
Are the pipe ends butt-welded horizontally? How can the reboiler be 10m tall? So big? A direct connection method is not very good, as it cannot absorb thermal stress. If the device is not vertical, it may be due to poor manufacturing quality or improper installation; over time, the stress on the pipe opening might cause leaks.
Reply #32016-02-25
Such a small voltage deviation will not have any significant impact on the operation.
Reply #42016-02-26
There is definitely an impact, but it’s hard to say exactly how great it is
Reply #52016-02-26
It should have no impact on operation, at least not on the thermosiphon effect
Reply #62016-02-26
2cm – it’s a problem, but not a serious one; there’s no need to worry too much about it
Reply #72016-02-26
Based on the data you provided (a 10m reboiler), a deviation of only 20mm has an extremely minor impact. If it is a falling-film type, then there is no impact. In the case of a rising-film type, if there is indeed an impact, it will be in the form of slight differences in the liquid holdup at the distribution heads located in different positions. As long as the circulation rate remains normal under normal operating conditions, with no interruptions or significant abnormalities, it should not cause coking of the material inside the tubes; normal operation should still be possible.
Reply #82016-02-27
10mm? How did you find that? It’s impossible to tell just by looking! It’s okay! ! ! Have you seen a reboiler tilted at 45 degrees to the tower? At a CMC manufacturing plant in Hangzhou
Reply #92016-02-27
There are no major issues with the process operation. But you should ask for the stress expert’s opinion to see if there is any misalignment or twisting, as it’s not good to keep straining.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.