HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Questions regarding methanation (DAVY)

2016-03-15View Original

Thread Content

Recently, during the installation of the rising and falling tubes for D301 (the steam drum), it was noted in the drawings related to the falling tubes that there is a weld site reserved for a hydrostatic test. The note states that after the hydrostatic test is completed, the existing weld will be cut before grooving welding is carried out for official use. I would like to ask those who are familiar with the DAVY process: what is the purpose of this design? I have seen many similar devices and apparatuses in use before, but none of them came with such instructions or operating procedures; I hope experts can provide a comprehensive explanation:
Reply #22016-06-16
It should take into account the accuracy of the fitting together of the prefabricated pipe ends at the site

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.