What are the requirements regarding the weld thickness after pipeline welding?

2016-03-31View Original

Thread Content

The slag left after welding by the construction team is clearly uneven at present; I’m not sure what requirements exist for inspecting pipes after welding
Reply #22016-03-31
Check the construction acceptance standards, such as GB50184
Reply #32016-03-31
Is that weld metal? The slag should be knocked off. .
Reply #42016-04-10
Generally, the weld should be about 2 to 3 millimeters higher than the pipe

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.