HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Sulfur Daily Question, April 18------5 rewards for participation, 10 rewards for correct answers

2016-04-18View Original

Thread Content

This post was last edited by Sulfur-Zinc-Aluminum on 2016-4-20 at 13:32. What are the reasons for unqualified purified water and what are the solutions?
Reply #22016-04-18
Reasons: 1. High concentration of raw water; 2. Large volume of feed with high concentration; 3. Low temperature at the bottom of the tower; 4. Large fluctuations in pressure or liquid level inside the tower; 5. Internal leakage in the heat exchanger; 6. High oil content in the raw water fed into the tower; 7. Low emission volume of acidic gases; 8. Low amount of material withdrawn via side streams; 9. C-1 flooding of the tower. Solutions: 1. Appropriately reduce the amount of cold and hot feed entering the tower; 2. Appropriately reduce the amount of cold and hot feed entering the tower; 3. Appropriately increase the temperature at the bottom of the tower; 4. Adjust the pressure and liquid level inside the tower to normal levels; 5. Isolate the heat exchanger with internal leakage for repair; 6. Improve the oil removal process in the raw water tank; 7. Appropriately increase the emission volume of acidic gases; 8. Appropriately increase the amount of material withdrawn via side streams; 9. Adjust operations to normal conditions
Reply #32016-04-18
Reasons: 1. High concentration of feed water. 2. Large treatment volume with high concentration. 3. Low temperature at the bottom of the tower. 4. Large fluctuations in pressure or liquid level inside the tower. 5. Internal leakage in the heat exchanger. 6. High oil content in the feed water entering the tower. 7. Low emission of acidic gases. 8. Low amount of material withdrawn via side streams. 9. Tower flooding. Solutions: 1. Appropriately reduce the amount of cold and hot feed entering the tower. 2. Appropriately reduce the amount of cold and hot feed entering the tower. 3. Appropriately increase the temperature at the bottom of the tower. 4. Adjust the pressure and liquid level inside the tower to normal levels. 5. Isolate the heat exchanger with internal leakage for maintenance. 6. Improve the oil removal process in the feed water tank. 7. Appropriately increase the emission of acidic gases. 8. Appropriately increase the amount of material withdrawn via side streams. 9. Adjust operations to normal conditions.
Reply #42016-04-18
1. High concentration of raw water. 2. Large volume of feed with high concentration. 3. Low temperature at the bottom of the tower. 4. Large fluctuations in pressure or liquid level inside the tower. 5. Internal leakage in the heat exchanger. 6. High oil content in the raw water fed into the tower. 7. Low emission volume of acidic gases. 8. Low amount of material withdrawn via side streams. 9. C-1 tower flooding. Treatment methods: 1. Appropriately reduce the amount of cold and hot feed entering the tower. 2. Appropriately reduce the amount of cold and hot feed entering the tower. 3. Appropriately increase the temperature at the bottom of the tower. 4. Adjust the pressure and liquid level inside the tower to normal levels. 5. Isolate the heat exchanger with internal leakage for repair. 6. Improve the oil removal process in the raw water tank. 7. Appropriately increase the emission volume of acidic gases. 8. Appropriately increase the amount of material withdrawn via side streams. 9. Adjust operations to normal conditions
Reply #52016-04-18
Reasons: 1. High concentration of feed water. 2. Large volume of feed with high concentration. 3. Low temperature at the bottom of the tower. 4. Large fluctuations in pressure or liquid level inside the tower. 5. Internal leakage in the heat exchanger. 6. High oil content in the feed water entering the tower. 7. Low emission volume of acidic gases. 8. Low amount of material drawn off via side streams. 9. C-1 flushing of the tower.
Solutions: 1. Appropriately reduce the amount of cold and hot feed entering the tower. 2. Appropriately reduce the amount of cold and hot feed entering the tower. 3. Appropriately increase the temperature at the bottom of the tower. 4. Adjust the pressure and liquid level inside the tower to normal levels. 5. Isolate the heat exchanger with internal leakage for repair. 6. Improve the oil removal process in the feed water tank. 7. Appropriately increase the emission volume of acidic gases. 8. Appropriately increase the amount of material drawn off via side streams. 9. Adjust operations to normal conditions
Reply #62016-04-18
What are the reasons for substandard purified water and what are the solutions? Answer: Reasons: 1. High concentration of raw water; 2. Large treatment volume with high concentration; 3. Low temperature at the bottom of the tower; 4. Large fluctuations in pressure or liquid level inside the tower; 5. Internal leakage in the heat exchanger; 6. High oil content in the raw water fed into the tower; 7. Low emission volume of acidic gases; 8. Low amount of material withdrawn via side streams; 9. C-1 flooding of the tower. Solutions: 1. Appropriately reduce the amount of cold and hot feed entering the tower; 2. Appropriately reduce the amount of cold and hot feed entering the tower; 3. Appropriately increase the temperature at the bottom of the tower; 4. Adjust the pressure and liquid level inside the tower to normal levels; 5. Isolate the heat exchanger with internal leakage for repair; 6. Improve the oil removal process in the raw water tank; 7. Appropriately increase the emission volume of acidic gases; 8. Appropriately increase the amount of material withdrawn via side streams; 9. Adjust operations to normal conditions.
Reply #72016-04-18
What are the reasons for substandard purified water and what are the solutions? Answer: Reasons: 1. High concentration of raw water; 2. Large treatment volume with high concentration; 3. Low temperature at the bottom of the tower; 4. Large fluctuations in pressure or liquid level inside the tower; 5. Internal leakage in the heat exchanger; 6. High oil content in the raw water fed into the tower; 7. Low emission volume of acidic gases; 8. Low amount of material withdrawn via side streams; 9. C-1 flooding of the tower. Solutions: 1. Appropriately reduce the amount of cold and hot feed entering the tower; 2. Appropriately reduce the amount of cold and hot feed entering the tower; 3. Appropriately increase the temperature at the bottom of the tower; 4. Adjust the pressure and liquid level inside the tower to normal levels; 5. Isolate the heat exchanger with internal leakage for repair; 6. Improve the oil removal process in the raw water tank; 7. Appropriately increase the emission volume of acidic gases; 8. Appropriately increase the amount of material withdrawn via side streams; 9. Adjust operations to normal conditions.
Reply #82016-04-18
Reasons: 1. High concentration of raw water; 2. Large volume of feed with high concentration; 3. Low temperature at the bottom of the tower; 4. Large fluctuations in pressure or liquid level inside the tower; 5. Internal leakage in the heat exchanger; 6. High oil content in the raw water fed into the tower; 7. Low emission volume of acidic gases; 8. Low amount of material withdrawn via side streams; 9. C-1 flushing of the tower. Solutions: 1. Appropriately reduce the amount of cold and hot feed entering the tower; 2. Appropriately reduce the amount of cold and hot feed entering the tower; 3. Appropriately increase the temperature at the bottom of the tower; 4. Adjust the pressure and liquid level inside the tower to normal levels; 5. Isolate the heat exchanger with internal leakage for repair; 6. Improve the oil removal process in the raw water tank; 7. Appropriately increase the emission volume of acidic gases; 8. Appropriately increase the amount of material withdrawn via side streams; 9. Adjust operations to normal conditions
Reply #92016-04-18
Reasons: 1. High liquid level at the bottom of the tower, resulting in poor separation; 2. Low steam pressure and low temperature; 3. Excessive feed volume with high acidity; 4. Leakage inside the heat exchanger; 5. Low amount of material extracted from the side stream. Solutions: 1. Increase the amount of acidic gas extracted while maintaining the top temperature of the tower; 2. Raise the temperature at the bottom of the tower; 3. Stabilize the feed volume; 4. Repair the heat exchanger through a bypass; 5. Increase the amount of material extracted from the side stream
Reply #102016-04-19
Reason: The liquid level at the bottom of Tower 1 is high, causing flooding of the tower and resulting in poor separation efficiency. 2 Low steam pressure 3 High feed rate and high concentration of acidic water 4 Internal leakage in the heat exchanger 5 Low amount of material withdrawn from the side stream. Solutions: 1 Increase the amount of acidic gas withdrawn as much as possible while maintaining the temperature at the top of the tower. 2 Slightly raise the temperature at the bottom of the tower. 3 Stabilize the feed rate and determine the cause of changes in the concentration of acidic water. 4 If there is an internal leakage in the heat exchanger, use it as a bypass for maintenance purposes. 5 Increase the amount of material withdrawn from the side stream

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.