Multiple-choice question: A newly built chemical plant is required, by regulation, to undergo a preliminary assessment of labor safety and hygiene, and this assessment should be carried out specifically by (). A. Construction entity B. Design unit of the construction project C. Local safety supervision and management agency D. Unit other than the design unit of the construction project that has the qualification for pre-evaluation of labor safety and health Conditions: D. Unit other than the design unit of the construction project that has the qualification for pre-evaluation of labor safety and health
Reply #22016-04-26
A newly built chemical plant is required to undergo a preliminary assessment of labor safety and health in accordance with regulations, and this preliminary assessment should be carried out by (D). A. Project owner B. Design unit of the construction project C. Local safety supervision and management agency D. Unit other than the design unit of the construction project that has the qualification for pre-evaluation of labor safety and health
Reply #32016-04-26
D. Units other than the design firms for construction projects that possess the qualifications for pre-evaluation of labor safety and health
Reply #42016-04-26
A newly built chemical plant is required to undergo a preliminary assessment of labor safety and health in accordance with regulations, and this preliminary assessment should be carried out by (D). A. Project owner B. Design unit of the construction project C. Local safety supervision and management agency D. Unit other than the design unit of the construction project that has the qualification for pre-evaluation of labor safety and health
Reply #52016-04-26
A newly built chemical plant is required to undergo a preliminary assessment of labor safety and health in accordance with regulations, and this preliminary assessment should be carried out by (D). A. Project owner B. Design unit of the construction project C. Local safety supervision and management agency D. Unit other than the design unit of the construction project that has the qualification for pre-evaluation of labor safety and health

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.