HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Installation of hangers and spring supports

2016-05-08View Original

Thread Content

In software, how is a rigid double-rope hanger set up? How to set up a double rod spring hanger? How are series and parallel spring supports and hangers installed respectively?
Reply #22017-04-10
I’m not sure what you mean – a rigid support strut, Sway Strut? Damping spring Sway Brace? For parallel and series connections, just search online; someone has asked about it before.
Reply #32017-08-06
C2S is a stress calculation software, not a pipeline design software; design details still require manual consideration; It seems that series connection of springs also cannot be done automatically, while parallel connection can be calculated automatically.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.