HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Precautions for starting up and shutting down the purification system

2016-05-22View Original

Thread Content

Precautions for starting up and shutting down the purification system
Reply #22016-05-23
Do not exhaust the gas too quickly to prevent shock damage to the molecular sieve bed
Reply #32016-05-23
1. To prevent too rapid pressure increase that could impact the bed layer, the pressure rise rate is generally controlled through a manual gas control valve. 2. Check whether the valve status matches the current step; if not, make adjustments promptly. For the first time or after a long period of inactivity, it is recommended to go through the steps again. 3. The pressure increase of the air compressor should be less than 5 Kpa per time, to prevent water from the air-cooling tower from entering the molecular sieve. 4. In heating or cold-blowing mode, pay attention to the operation of the air regeneration gas; ensure an adequate supply of heating gas to prevent the heater from overheating. These are basically the precautions. Of course, there are some specific faults that require special handling~~
Reply #42016-05-26
During the startup of the molecular sieve, when using open-air bypass as the regeneration gas, it is essential to open the bypass valve slowly and adjust the pressure of the air compressor promptly to prevent excessive pressure fluctuations that could cause water to be carried into the air cooling tower. Similarly, when switching the regenerated gas to waste nitrogen gas, the operation must be carried out slowly to prevent the air compressor pressure from becoming too high.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.