【Daily Topic】【Engineering Version 20160529】

2016-05-29View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 Wealth. Multiple-choice question: The magnitude of the deviation in the results of mine connection surveys depends on ( ).   A. The selected traverse survey scheme B. The accuracy of the surface survey network C. The correctness of the survey methods D. The quality of the actual survey work E. The methods for indoor calculations
Reply #22016-05-30
A. The selected penetration measurement scheme   C. The accuracy of the measurement method  D. The quality of the actual measurement work
Reply #32016-05-30
The magnitude of the deviation in the results of mine cross-hole surveying depends on (D).   A. The selected traverse survey scheme B. The accuracy of the surface survey network C. The correctness of the survey methods D. The quality of the actual survey work E. The methods for indoor calculations
Reply #42016-05-30
A. The selected through-measurement scheme C. The accuracy of the measurement method D. The quality of the actual measurement work

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.