To increase the popularity of the purified area, a \"One Question per Day\" campaign was launched to foster an active atmosphere for technical exchanges while offering members certain financial rewards. (Fellow sailors, if you have any good questions, feel free to send them to me; let’s work together on them.) 【Question of the Day】 (Multiple choice) What should be taken into consideration when connecting a waste heat boiler to the power grid? (  ) A. The liquid level in the waste heat boiler should not be too high. B. The condensate water should first be drained from the pre-drain before the grid connection valve. C. The bottom discharge mechanism of the waste heat boiler should be enhanced. D. After grid connection, the boiler operator should be notified promptly to make adjustments. Please reply with your answers; participating in the quiz earns +2 wealth points, and those who get all answers correct will receive an additional +3 to +8 wealth points. Those who provide thorough analyses and explanations for the questions or answers (including detailed calculation processes) will receive extra wealth points as a reward. If your answers are correct and your analysis is accurate, it will be marked as the best reply (or the best assistance). Feel free to answer. USA
Reply #22016-06-20
A. The level of the waste heat boiler should not be too high. B. The condensate in the pre-drain line before the grid connection valve must be drained first. D. After connecting to the grid, notify the boiler to make adjustments promptly

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.