Name of the unit that issues the as-built drawing stamp in a general contracting project

2016-07-07View Original

Thread Content

In subcontracted projects, the as-built drawing seal is signed and stamped by the construction unit, while the design unit handles any changes and prepares new drawings. In a turnkey EPC project, the general contractor is responsible for design, construction, and commissioning, and it is common to subcontract the construction work. When preparing the as-built drawings, should the constructor write the name of the general contractor or its own name?
Reply #22016-07-07
The design drawings are prepared by the design firm; therefore, they should be stamped by the general contractor
Reply #32016-07-08
The as-built drawings should indicate the name of the general contractor.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.