HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Daily Question 2016.7.16 (EIA Discussion): 3 Wealth points for replies, plus 5 Wealth points for correct answers (single-choice question)

2016-07-18View Original

Thread Content

This post was last edited by Zhang Xiaopeng on 2016-7-18 08:09. 27. A certain coal indirect liquefaction project has an annual operating time of 8,000 hours, and 10 gasifiers are installed. Inspection is carried out once a year; when the gasifier is started, unqualified crude gas is sent to a high-pressure flare for treatment, with each such process lasting 3.5 hours. When a single gasification furnace is started, the sulfur dioxide generated by the flare is approximately 5 t/h. The annual sulfur dioxide emission amount from the gasifier during operation of this project is approximately ( ). A. 210 t/a B. 175 t/a C. 50 t/a D. 35 t/a Answer: B. Explanation: Pay attention to the question – it asks for the sulfur dioxide emission amount during operation; therefore, the figure of 8000 hours is irrelevant. 3.5*10*5=175

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.