Multiple-choice question: In the acetylene generation process using the calcium carbide method, when the volume of the acetylene gas tank is below 30%, and neither the hoppers nor storage tanks have been filled with calcium carbide, nor has the material in the oscillator compartment been properly handled, what does the DCS operator decide to do? A. Reduce the volume B. Stop the operation C. Increase the volume D. Wait for the on-site operator to resolve it Answer: A. Reduce the volume
Reply #22016-07-26
In the calcium carbide process for acetylene production, the volume of the acetylene gas tank is below 30%, the hoppers and storage tanks still do not contain any calcium carbide, and the material in the oscillator compartment has not been properly handled; as a result, the DCS operator decided on option (A). A、Reduce volume B、Stop the machine C、Increase volume D、Wait for the on-site operator to resolve it

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.