Thread Content
Dear sea friends, I have a very basic question... Our cooling tower is designed to handle a flow rate of 9000 m3/h, but the actual maximum flow rate of the circulating water is 6400 m3/h. So here’s the question: when submitting a bid for chemicals to be used in the circulating water system, we can fill in the amount of water in circulation; that part is easy to determine. But should we enter 9000 or 6400 as the flow rate? Thank you~!
Keep an eye on us; we specialize in water treatment. Once you have made your decision, you can invite us to submit a bid. If you go with 9,000, someone will definitely ask for clarification, so don’t worry. Those who want to win the contract without even offering any clarifications shouldn’t be given the chance to work with them; it will cause a lot of problems later on. If such minor details aren’t discussed in advance, how well can the work be done?
Fill in according to the actual situation; the designed treatment capacity of the cooling tower is 9000 m3/h, and the current maximum volume of circulating water is 6400 m3/h.
Write according to the designed capacity, but indicate the actual usage amount
The actual water consumption, design capacity, and other parameters should be indicated.
It mainly depends on the amount of circulating water used in the future; generally, 6400 should be used as a reference value. This figure refers primarily to the amount of chemicals required, as well as the parameters related to the circulating water
I don’t understand; your chemical dosage depends not only on the amount of circulating water but also on the water quality. For your tender for purchasing medications, it specifies either the unit price or the total quantity over a certain period. Isn’t the quantity for the tendering and procurement of medications specified in the design requirements?
The circulating water volume is definitely set to 6,400 cubic meters based on the actual value. Although the cooling tower is designed for 9,000 cubic meters, that is the theoretical maximum value and it’s unlikely to be achieved; therefore, the actual value is generally used as the reference.