HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Sulfuric acid plant pipeline characteristic table

2016-08-25View Original

Thread Content

I am looking for a table of pipeline characteristics for sulfuric acid production plants; in particular, I want to know whether pressure or airtightness tests are required for the pipelines in the conversion section. Please provide some guidance
Reply #22016-08-25
The newly installed pipes need to be cleaned before undergoing a gas-tightness test
Reply #32016-08-26
Do large-diameter flue gas pipes also require a leak test? Pipes and equipment are welded together, making it difficult to divide them into sections@_@
Reply #42016-08-27
Regardless of the size of the pipeline, a gas-tightness test should be conducted; it can be done as a whole, using a fan, which is simple and convenient

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.