Since the material flows from bottom to top, can a vortex flow meter be installed?

2016-08-31View Original

Thread Content

This post was last edited by Peng Jun on 2016-9-1 at 14:12. The quality of the previous installation components was used elsewhere; now that we’ve switched to vortex flow meters, can they be installed in this way? Also, the vortex flow meters have a diameter of 1 inch, while the liquid pipeline has a diameter of 1/2 inch. So, use a flange welded with 1/2 turn and 1-inch diameter; the straight pipe section ahead has a 1-inch diameter but is only 10d long. However, the 1/2 inch straight pipe section is quite long – is this acceptable?
Reply #22016-08-31
Vertically from bottom to top, just a character was removed
Reply #32016-08-31
It’s possible; during installation, make sure it’s fully seated, and maintain a distance of 10 units in front and 5 units behind
Reply #42016-08-31
Could you please tell me about the medium being measured and some of the operating conditions at the site? Based solely on the flow direction from bottom to top as described by the poster, I think it might not be appropriate
Reply #52016-08-31
Is there a difference between accuracy and proper installation?
Reply #62016-09-01
Installing it from bottom to top is no problem; although it’s not installed horizontally, it still works. The diameter of your flow tube is twice that of the liquid pipeline, so it probably won’t work very well – the flow rate of the liquid is too low, and the vortex flow meter is unable to measure it
Reply #72016-09-01
Sure, no problem; I guarantee full pipes and straight sections.
Reply #82016-09-02
It can be installed vertically, with the liquid flowing from bottom to top (and the gas from top to bottom); however, this involves tube expansion, and the pipe section ahead must be larger than 35D, while the subsequent pipe section must be larger than 5D
Reply #92016-09-02
Desalinated water, please! Install a filter in front of the turbine; it’s simple to maintain, or an electromagnetic one can be used

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.