HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is post-weld heat treatment required for 15CrMo pipes?

2016-08-31View Original

Thread Content

Hi Hai, I encountered 15CrMo pipes in a project. According to standard 50235, no heat treatment is required for these pipes, but the quality control team believes that heat treatment is necessary. Has anyone else run into this issue? How should it be handled?
Reply #22016-08-31
Chromomolybdenum steel requires preheating before welding, and heat treatment must be carried out after welding. If left untreated, cracks are likely to form at high temperatures.
Reply #32016-09-01
According to the standards, there should be requirements regarding thickness; unless stress corrosion and delayed cracking are involved, thickness requirements do apply in other operating conditions
Reply #42016-09-01
No standards were seen. Our company requires heat treatment for chromium-molybdenum steel welding, regardless of thickness.
Reply #52016-09-01
GB150 specifies this; there are other requirements for pipes

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.