HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Codes for building design, sections 3.6.8 and 3.6.9

2016-09-27View Original

Thread Content

How are the main control room and sub-control rooms defined in clauses 3.6.8 and 3.6.9 of the building code? There is only one production line in Workshop A; is this control room the main control room or a sub-control room?
Reply #22016-10-31
It should be helpful to consult a pharmaceutical process engineer and look at the explanations of the provisions

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.