HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】June 25: When heating a newly built furnace for drying, what constant temperature should be maintained in the furnace chamber to remove crystalline water?

2015-06-25View Original

Thread Content

Daily activity question (single-choice question): When heating a new furnace for drying, maintaining a constant temperature in the furnace chamber at (  ) is intended to remove crystalline water. A. 150 degrees B. 350 degrees C. 500 degrees D. 600 degrees Answer: The hidden content in this post is B, 350 degrees. Please participate actively to win prizes. +5 points for correct answers, +2 points for participation. One time per person only. Close this topic in two days.
Reply #22015-06-25
When heating a newly built furnace for drying, maintaining a constant furnace temperature of (B, 350 degrees) is intended to remove the crystalline water.
Reply #32015-06-25
When heating a newly built furnace for drying, maintaining a constant furnace temperature at (B) is intended to remove the crystalline water. A、150 degrees B、350 degrees C、500 degrees D、600 degrees Answer: B
Reply #42015-06-25
When heating a newly built furnace for drying, maintaining a constant temperature in the furnace chamber at (  ) is intended to remove crystalline water. B, 350 degrees
Reply #52015-06-25
Choose B: free water is removed at 150°C, and crystalline water is removed at 350°C
Reply #62015-06-25
When heating a newly built furnace for drying, maintaining a constant furnace temperature at (  A ) is intended to remove crystalline water. A、150 degrees B、350 degrees C、500 degrees D、600 degrees
Reply #72015-06-25
At 350 degrees, the crystalline water is removed; at over 100 degrees, the free water is removed; sintering takes place at 500–600 degrees

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.