I would like to ask the experts: In standards such as ASME B31.3, are there any specific requirements regarding the offset of longitudinal welds when performing butt welding on large-sized straight-seam pipes? What is the required offset distance for longitudinal welds according to these American standards?
Reply #22016-10-13
Seeking advice online; please help, experts
Reply #32016-10-13
There should be a separation of at least 200; generally, it is required that the separation be at an angle of 45 degrees above, so that the bracket does not cover the pipe welds
Reply #42016-10-14
:lol:lolIt doesn’t seem to be specified in ASME B31.3. .
Reply #52016-10-16
In actual projects, the inspection party has requested that the same approach as used on the third floor be adopted in order to avoid overlapping welds on the welding bracket gussets

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.