HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

UOP continuous reforming, C6 removal column pressure control

2016-10-14View Original

Thread Content

There is a pressure difference displayed between the top and bottom pressures of the C6 removal tower; no control is provided for this. The gas at the tower top passes through air cooling before reaching the reflux tank. The pressure in the reflux tank is controlled by a self-acting control valve that introduces nitrogen. Does ensuring the pressure in the reflux tank automatically ensure the pressure at the tower top as well?
Reply #22016-10-24
There should also be an appropriate reflux ratio to ensure effective fractionation

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.