For the factory trial run, how should the acceptance party inspect the equipment?

2016-10-21View Original

Thread Content

When a piston-type device undergoes factory testing by the manufacturer, what aspects should the inspector consider when checking the equipment? Vibration, pressure, flow rate, power, various temperatures? Is disassembly and inspection still required after the test? Thank you
Reply #22016-10-21
Piston equipment undergoes factory testing by the manufacturer; as the party responsible for acceptance, one should consider: first, the relevant standards for reciprocating machines; Second, check whether the manufacturer has followed the test plan ; Third, check that the bearing temperature is below 65°C, that the vibration levels meet the requirements of ISO10816, and conduct other inspections on the equipment
Reply #32016-10-21
First of all, when placing an order, there should be a technical attachment specifying whether it is a load test or a no-load test; check it carefully. Let’s take a look at the relevant provisions in the standards. Conduct on-site testing: check the appearance, listen to the sounds, and measure vibration, temperature, pressure, flow rate, etc. Special attention should be paid to defining the scope of supply.
Reply #42016-10-21
1: Be familiar with the contracts and technical agreements between both parties. 2: Thoroughly study the standards related to the equipment, especially those specified in the contract. 3: Develop inspection outlines, testing standards, testing equipment, and testing methods. 4: Review relevant records of incoming material inspections, testing, inspections during the manufacturing process, and assembly records. 5: Test mechanical properties in accordance with the standards and contract requirements. 6: Conduct visual inspections. 7: Check packaging and technical documentation. 8: Identify issues and implement corrective actions!
Reply #52016-10-21
Is it still necessary to carry out disassembly and inspection after the test run is successful?
Reply #62016-10-21
I’m a newbie. Is it necessary to check the equipment assembly records? ?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.