Regarding the methanol regeneration time

2016-11-03View Original

Thread Content

Our company’s low-temperature unit requires emergency maintenance and stopping of operations; the shorter the time, the better. How short can the methanol regeneration process be? What are the standards?
Reply #22016-11-06
It’s best to be more specific, such as which device it is, and to see if regeneration is not necessary.
Reply #32016-11-08
If maintenance is required on a specific tower, it can be isolated separately without the need to remove all methanol from the plant
Reply #42016-11-10
Equipment in cold areas must take equipment rewarming into account
Reply #52016-11-11
The standard is to control the heating rate at 2-3°C/h. When both the primary and secondary outlet temperatures of the scrubber are above 0°C, and the temperature at the middle section of the hydrogen sulfide concentration tower is also above 0°C, the warming process is complete. Of course, methanol regeneration is also taken into account to prevent H2S poisoning of personnel.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.