HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Coal-to-gas

2016-12-11View Original

Thread Content

This post was last edited by lflsedin on 2016-12-11 at 17:38. What is the current production scale for coal-to-gas conversion, and what is the largest scale currently in use? Thank you
Reply #22016-12-11
**The specified amount of coal-to-natural gas is not less than 2 billion cubic meters. Most of the planning is 4 billion cubic meters. It seems that the maximum value currently in use is around 1.33 billion.
Reply #32016-12-12
One can take a look at the several coal-to-natural gas projects that have recently passed environmental impact assessments, as well as those that are already in operation; it’s not difficult to find them
Reply #42016-12-12
Coal-to-gas production facilities come in various scales; the largest ones in China have a capacity of 1 billion cubic meters per year. This process features a simple flowchart, with the preceding stages such as air separation, gasification, and purification being technologies that are already well-established. As for methane synthesis, the David process is currently the preferred method on a large scale. This company has already applied its second-generation technology in China, with the key improvements lying in the design of the main reactor and the use of second-generation catalysts on an industrial scale.
Reply #52016-12-12
The total capacity is regulated; it seems that there are documents stating it should be no less than 2 billion cubic meters per year. In China, the typical capacity is 4 billion cubic meters per year, with 4 production lines – though some designs include 3 production lines, in which case the capacity per line would be 1.33 billion cubic meters per year

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.