HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

May I ask how to create a cancellation task card?

2016-12-14View Original

Thread Content

Could everyone please explain the specific procedures and methods? After the modification of our facility, it will be capable of hydrogenating 600,000 tons of gasoline and diesel, using a cold high-pressure process; the compressors used are centrifuges and turbines manufactured by Shenyang Blower
Reply #22016-12-15
High water replacement, stopping the pump, switching pumps, starting the compressor, stopping the compressor – all these are the things that cause concerns. By listing out the steps and indicating who is involved in each step, that should cover it~~~~

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.