With the boiler about to be put into operation, what certification reports showing compliance with performance standards, issued by third-party authoritative agencies, does the boiler manufacturer need to provide? In which specific time periods?
The pressure vessel inspection report must be provided at the time of shipment.
The pressure vessel inspection report is provided by the boiler factory; what I need is an inspection report issued by a third-party testing agency
Installation inspection report issued by the local boiler inspection agency
The installation supervision inspection report may also require a water quality analysis report
Which department provides the water quality analysis report?
Is the boiler installation supervision inspection report issued after the boiler’s hydrostatic test or at the acceptance stage?
The boiler installation supervision and inspection report is issued by the installation supervision and inspection agency (usually a special inspection institute) after the boiler installation is completed and the installation contractor submits the completion documents to this agency; it is issued certainly after the hydrostatic test. As for whether a water quality analysis report is required and who can issue it, one can consult the installation supervision and inspection agency. In addition, a safety valve calibration report and a pressure gauge verification report are also needed – those can be issued by those who have the appropriate qualifications; if not, one should consult the installation supervision and inspection agency
Water quality analysis reports are usually issued by the boiler inspection agency along with the boiler inspection results
Obtain the installation supervision inspection report and apply for a usage registration certificate; for pipelines under pressure, flaw detection is also required