HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Weekly Topic】Pipes and Valves Discussion Area 11-5-2~8

2011-05-04View Original

Thread Content

This post was last edited by security on 2011-5-7 15:39. [Question] What are the principles for the pipeline design of flammable liquids, flammable gases, and liquefied hydrocarbons? (l) Pipelines shall not pass through buildings that are not related to them ; (2) Piping should be installed overhead or along the ground ; (3) When conduit laying is necessary, measures must be taken to prevent the accumulation of gases or liquids within the conduit, and sealing barriers should be installed at the inlet and outlet devices as well as in the plant building ; (4) The wastewater in the trench should be sealed with a water seal and discharged into the production wastewater pipeline ; (5) Sampling pipes should not be led into the laboratory ; (6) Metal pipes should be connected by welding, unless flange connection is required for special purposes.
Reply #22011-05-04
(l) Pipelines shall not pass through buildings that are not related to them; (2) Piping should be installed overhead or along the ground ; (3) When conduit laying is necessary, measures must be taken to prevent the accumulation of gases or liquids within the conduit, and sealing barriers should be installed at the inlet and outlet devices as well as in the plant building ; (4) The wastewater in the trench should be sealed with a water seal and discharged into the production wastewater pipeline ; (5) Sampling pipes should not be led into the laboratory ; (6) Metal pipes should be connected by welding, unless flange connection is required for special purposes.
Reply #32011-05-04
(l) Pipelines shall not pass through buildings that are not related to them; (2) Piping should be installed overhead or along the ground ; (3) When conduit laying is necessary, measures must be taken to prevent the accumulation of gases or liquids within the conduit, and sealing barriers should be installed at the inlet and outlet devices as well as in the plant building ; (4) The wastewater in the trench should be sealed with a water seal and discharged into the production wastewater pipeline ; (5) Sampling pipes should not be led into the laboratory ; (6) Metal pipes should be connected by welding, unless flange connection is required for special purposes.
Reply #42011-05-04
Reply to 1# Xiao Luotou: (l) Pipelines shall not pass through buildings that are not related to them; (2) Piping should be installed overhead or along the ground ; (3) When conduit laying is necessary, measures must be taken to prevent the accumulation of gases or liquids within the conduit, and sealing barriers should be installed at the inlet and outlet devices as well as in the plant building ; (4) The wastewater in the trench should be sealed with a water seal and discharged into the production wastewater pipeline ; (5) Sampling pipes should not be led into the laboratory ; (6) Metal pipes should be connected by welding, unless flange connection is required for special purposes.
Reply #52011-05-04
(l) Pipelines shall not pass through buildings that are not related to them; (2) Piping should be installed overhead or along the ground ; (3) When conduit laying is necessary, measures must be taken to prevent the accumulation of gases or liquids within the conduit, and sealing barriers should be installed at the inlet and outlet devices as well as in the plant building ; (4) The wastewater in the trench should be sealed with a water seal and discharged into the production wastewater pipeline ; (5) Sampling pipes should not be led into the laboratory ; (6) Metal pipes should be connected by welding, unless flange connection is required for special purposes.
Reply #62011-05-04
(l) Pipelines shall not pass through buildings that are not related to them; (2) Piping should be installed overhead or along the ground ; (3) When conduit laying is necessary, measures must be taken to prevent the accumulation of gases or liquids within the conduit, and sealing barriers should be installed at the inlet and outlet devices as well as in the plant building ; (4) The wastewater in the trench should be sealed with a water seal and discharged into the production wastewater pipeline ; (5) Sampling pipes should not be led into the laboratory ; (6) Metal pipes should be connected by welding, unless flange connection is required for special purposes.
Reply #72011-05-04
(l) Pipelines shall not pass through buildings that are not related to them; (2) Piping should be installed overhead or along the ground ; (3) When conduit laying is necessary, measures must be taken to prevent the accumulation of gases or liquids within the conduit, and sealing barriers should be installed at the inlet and outlet devices as well as in the plant building ; (4) The wastewater in the trench should be sealed with a water seal and discharged into the production wastewater pipeline ; (5) Sampling pipes should not be led into the laboratory ; (6) Metal pipes should be connected by welding, unless flange connection is required for special purposes.
Reply #82011-05-04
The design principles for pipelines carrying flammable liquids, flammable gases, and liquefied hydrocarbons are as follows: 1. Pipelines shall not pass through buildings that are not related to them; 2. Pipelines should be installed overhead or laid along the ground. 3. When trench installation is necessary, measures must be taken to prevent gases or liquids from accumulating in the trench, and sealing barriers should be installed at the inlet and outlet devices as well as at the factory building ; 4. The wastewater in the trench should be sealed with a water seal and discharged into the production wastewater pipeline ; 5. Sampling pipes should not be led into the laboratory ; 6. Metal pipes should be connected by welding, unless flange connection is required for special purposes.
Reply #92011-05-04
The design principles for pipelines carrying flammable liquids, flammable gases, and liquefied hydrocarbons are as follows: (l) Pipelines shall not pass through buildings that are not related to them; (2) Piping should be installed overhead or along the ground ; (3) When conduit laying is necessary, measures must be taken to prevent the accumulation of gases or liquids within the conduit, and sealing barriers should be installed at the inlet and outlet devices as well as in the plant building ; (4) The wastewater in the trench should be sealed with a water seal and discharged into the production wastewater pipeline ; (5) Sampling pipes should not be led into the laboratory ; (6) Metal pipes should be connected by welding, unless flange connection is required for special purposes.
Reply #102011-05-04
【hide】 No 【/hide]

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.