【Weekly Topic】What design documents should the design entity of pressure vessels provide to the user? (2011.07.11-07.17)

2011-07-11View Original

Thread Content

This post was last edited by shuhuahuang on 2011-7-15 14:22. What design documents should the design agency for pressure vessels provide to the user?
Reply #22011-07-11
I have recently been involved in coordinating with design firms, and I would like to know in detail what design documents a pressure vessel design firm should provide to the client Thank you
Reply #32011-07-11
Let me start by talking from my personal experience – it’s not a strict rule written down! 1. One set of as-built drawings is provided for each piece of equipment, stamped with the official seal for pressure vessel design as well as the official seal for as-built drawings (for 70 sandblasting tanks in total, 70 sets of as-built drawings were prepared) ; 2. It seems that two copies of the calculation document are required (one for the boiler inspection agency and one for the user; this is now a mandatory requirement) ; 3. The material certification for all materials of this equipment must correspond to those of the container ; 4. Welding procedure qualification, I guess (I’m not in welding, so I’m not very familiar with this) ; 5. It’s a certification certificate issued by the boiler inspection agency (I’m not sure of its exact name), along with a unified serial number that seems to be printed on the nameplate ; It seems that these factory delivery documents are the responsibility of the quality supervision department; it shouldn’t be the design department’s task to provide such documents. This is just my personal opinion, for reference only!
Reply #42011-07-11
Reply to 3# wangjianwei86: Thank you. What is needed is experience in engineering practice. Applying what you’ve learned is what really matters!
Reply #52011-07-11
The design entity of the pressure vessel shall provide the user with the design drawings, and if necessary, also provide design and installation (operation) manuals. For medium-pressure and high-pressure reaction pressure vessels as well as storage pressure vessels, the design agency shall provide the user with a strength calculation report.
Reply #62011-07-11
1. Drawings 2. Calculation data 3. Installation instructions 4. Maintenance 5. Precautions 6. Inspection certificate from the safety authority
Reply #72011-07-11
Reply to 6# heshishen2010: I agree with your view, but for the third point, are the installation instructions also provided by the equipment manufacturer? ? Haven’t heard of this before! !
Reply #82011-07-11
I’d like to add one more point: for third-category pressure vessels, a risk assessment report should be prepared during the design phase, including information on the main failure modes and risk control measures! ! ! This also needs to be provided by the user! !
Reply #92011-07-11
Of course, there must be risk assessment reports and strength calculation documents. The design drawings prepared by the design agency are stamped with a red seal, and in some cases, separate technical specifications for fabrication and installation are provided as well
Reply #102011-07-11
Reply to 7# wangjianwei86: Hehe, thanks for the advice!
Reply #112011-07-11
The design agency must provide the design drawings and strength calculations; For the three types of containers, a risk assessment report is also required, and if necessary, design, installation, and operation manuals as well. Other materials such as books and quality certification documents should be provided by the manufacturing unit. If it is designed by the design department of the manufacturing unit, it should be provided together.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.