HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Design for open-air long-distance natural gas transmission

2017-05-09View Original

Thread Content

There is a project involving the long-distance transport of natural gas, over a distance of around 30 km. The pipes are installed in an open-air, overhead configuration, with a diameter of DN300. How should the expansion bends be designed – through natural compensation or by using expansion joints? Will natural compensation increase the pipe pressure drop? If an expansion joint is to be installed, what type of expansion joint should be used? How much needs to be set? What are the costs for expansion joints, and are the maintenance costs high?
Reply #22017-05-10
For a DN300 natural gas pipeline, I think very little compensation is needed; natural compensation will suffice

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.