HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The difference in the load-bearing capacity of the brackets between the two welding methods

2017-05-16View Original

Thread Content

Hello everyone, please look at the diagram below – what are the differences between these two welding methods? Which one has a better load-bearing capacity for the scaffold? Why? Thank you.
Reply #22017-05-16
Type I has a higher bearing capacity, as the circumferential weld around the root is longer than that in Type II; Type I has a large scope of limitation, while Type II is more common in practice.
Reply #32017-05-16
Is 1 the so-called welding on the side? Why does the bracket diagram state that 2 has a higher load-bearing capacity?
Reply #42017-05-17
The one at the back is better – it’s placed in the middle of the pillar, with iron embedded to keep it in place; the tension rods are properly arranged, and the angle irons look nice
Reply #52017-05-17
Personally, I think the first option is better, as the welding surface has greater contact with the opposite end, resulting in a higher load-bearing capacity
Reply #62017-05-20
These two welding bracket methods are those used in different locations in the SCI atlas, on the front and side of the wall; There is no such thing as a better or worse type of bracket; it needs to be chosen based on the installation location. Just ask your structural engineer and you’ll find out ; Then, with the same weld height and length, the second type has better load-bearing performance ; However, a large design margin is provided when using them; the rooting method is primarily chosen based on on-site requirements
Reply #72017-05-21
The second type applies most of the force to the wall, while the first type applies more of it to the main body

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.