HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Riser piping and valve installation

2017-08-13View Original

Thread Content

For the renovation of the fire protection pipelines, they extend out from the firewall in the tank area and connect directly downward to the main pipeline; there is a valve in between. The drawings indicate the elevation of the supports, the elevation of the main pipeline, and the elevation of the valve. How should the construction and installation process be carried out?
Reply #22017-08-14
This drawing is clear at a glance; on-site managers should understand it. If they don’t, that would be unusual

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.