HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Construction plan for pipelines of hydrogen peroxide plant

2017-09-30View Original

Thread Content

Who has a pipeline construction plan for hydrogen peroxide systems, and what are the differences between it and the pipeline construction plan for ordinary systems?
Reply #22024-11-17
During the construction of hydrogen peroxide pipelines, carbon steel contamination is strictly prohibited. Avoid using graphite gaskets; prefer stainless steel rings or PTFE-wrapped gaskets. After installation, the pipes need to be pickled and passivated.
Reply #32024-11-21
Apart from pickling and degreasing, it is the same as regular engineering. Just follow the requirements of the design drawings

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.