Flange tightening issues at -60°C

2018-05-14View Original

Thread Content

Valve flanges at -60°C require cold tightening; cold-insulation construction cannot be carried out at the moment. What do people do in such situations? Should the system be cooled first, and then stopped to insulate the valve flanges after cold tightening? Or is it not necessary to use cold tightening at all, and cooling measures can be implemented directly?
Reply #22018-05-14
I think cold straining should be carried out, and then insulation should be applied after that.
Reply #32018-05-14
We will weld as much as possible to reduce the number of leakage points; the flanges are wrapped separately for easier handling in the future!
Reply #42018-05-15
Do not insulate at the flange first; wait until cold tightening and hot tightening are completed before providing insulation.
Reply #52018-05-18
After cooling and tightening, the flange valves will definitely freeze over; won’t the insulation effect then be poor?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.